-
St Johns College Oxford Victorian Sports Pavilion recent expansion benefit from Buderus 2 boiler cascade system and integrated solar panel...
-
Snowdonia National Park visitor centre has recently completed an upgrade of its heating system with a three boiler cascade system from Buderus.
-
Following an in-depth assessment of heat demands and system requirements, three Buderus SB 615 640kW stainless steel condensing boilers were chosen...
-
Buderus has commissioned its largest ever multi-boiler heating system in the UK at Wandsworth Town Hall.
-
As part of a wider refurbishment project, three Buderus GE315 200kW cast iron boilers replaced the existing 20-year old boilers. The new, high...
-
It was recognised that a new, modern solar system was needed to provide the necessary heat for the swimming pool and the hot water needs of...
-
A new fuel efficient heating system has been installed to replace the existing 27-year old boilers at the prestigious Ashville College in Harrogate
-
Guest accommodation and services are of the highest order so it is no surprise that the same quality ethos is adopted for other aspects of the...
-
As fuel prices continue to rise and witht he reduction of carbon emissions a key goal of government, controls can make a substantial difference for...
-
Together Solar Solutions and Buderus have ensured a truly environmentally friendly installation which will pay for itself within an estimated...
-
Buderus have increased their range of energy saving commercial boiler controls with the new MCM10 intelligent sequencing module
-
The Buderus GB162 wall mounted condensing gas boiler has won one of the world's best known design awards because of its technical design excellence.
-
The government's injection of funds into school refurbishment is now coming into effect and actual work on the buildings is starting to take place....
-
Summary of minimum provisions
-
Buderus boilers installed at the Arndale shopping centre